← Back to Docs
视频教程

Face Terminal Installation Demo

Published 2026-06-08

EN

Hands-on video for wall/pole mounting, electrical wiring and first-power-on commissioning.

Demo video is provided by the delivery team.

This video demonstrates two mounting styles and first-commissioning for the VF105 face terminal.

Outline

1. Wall-mount locating & drilling; 2. Pole-mount & cabling; 3. Electrical wiring (power / network / exit button); 4. Power-on & platform binding; 5. Reading-policy config.

Companion Docs

Full steps and parameters are in the device-management API and product manuals. Video URL is provided by the delivery team.

FAQ

Which mounting styles?

Wall-mount and pole-mount, with wiring and first-power-on commissioning.

Wiring notes?

Connect power, network and exit button per terminal; insulate unused pins.

How to bind the platform?

After power-on, bind the device to the platform and run first commissioning and reading-policy config.

← Back to Home
免费获取方案白皮书48 小时内响应 · 写入 CRM 线索池
立即咨询